
Place your own GPU servers in Tier III designed Canadian data centres. Hut 8 provides the power, liquid-cooling-capable infrastructure, connectivity and security around them: up to 135 kW per rack, with 5 MW of high-density capacity available now in Kelowna and Mississauga.
Capacity as at Q3 2026. Confirm current availability with Hut 8.
▶ Hear the 90-second summaryInfraHub's independent take: what Hut 8 is offering, who it suits, and what to ask before you book.
Prefer to skim? Switch to Read.
Written by InfraHub, not Hut 8, and narrated with an AI voice. Figures are the provider's own claims.
A general-purpose facility spreads power across a floor. A GPU cluster concentrates it in a single cabinet. Three things decide whether a site can host yours, and a fourth decides whether you can start on time.
Ask for the kilowatts delivered to one cabinet, not a facility total. The right figure depends on your hardware.
135 kW and upAs rack power rises, air alone does less of the work. Liquid-cooling capability matters as densities climb.
Liquid-cooling capableRedundant power and cooling mean one failure doesn't stop training or inference. Check the design standard, power path and generator runtime.
Tier III designedCapacity is a finite pool and your timeline matters. High-density deployments here typically go live in a few weeks.
Typically weeksWhat is GPU colocation? You own the compute: GPU servers you buy and control. The facility provides the power, cooling, network and security around them.
Both are liquid-cooling capable, carrier-neutral and connected to Hut 8's 100G national backbone. They differ on cabinet size, energy source and location.
Best for liquid-cooled GPU clusters on 95% renewable hydroelectricity, larger 50U cabinets, or a second site alongside Vancouver.
Best for dense GPU deployments close to the Greater Toronto Area, with 42U cabinets and five carriers on site.
| Kelowna (KEL1) | Mississauga (GTA1) | |
|---|---|---|
| Available now | 2.5 MW of 3 MW secured | 2.5 MW of 3.5 MW designed |
| Power per rack | Up to 135 kW | 135+ kW |
| Cabinets | 50U | 42U |
| Cooling | Chilled-water closed loop plus air, N+1, two 200-tonne chillers, cold aisle containment, winter free cooling. Liquid-cooling capable. | Chilled water. Liquid-cooling capable. |
| Power path | 2N (A+B) | 2N power and 2N UPS |
| Generators | 2 × 1,500 kW, 29+ hours at full load | 10 × 700 kW (N+1), 24+ hours |
| Energy | 95% renewable hydroelectricity | Utility grid |
| Carriers | Telus, Rogers, Zayo, Bell | Rogers, Bell, Zayo, Cogent, Telus |
| Location | Described by Hut 8 as one of the lowest geographic risk profiles in North America | About 25 km from Toronto |
100G ports, dark fibre, cross-connects and diverse fibre entrances. A 100G national backbone links all five Hut 8 Canada data centres.
100G backboneEvery site is SOC 2 Type II certified, with card and biometric access, 24/7 NOC-monitored CCTV and a 99.99% uptime SLA.
SOC 2 Type IIEquipment at every Hut 8 Canada site is hosted in Canadian facilities, which supports PIPEDA data residency requirements.
PIPEDA-supportingHut 8 says high-density deployments typically go live in a few weeks. The usual path has four steps.
Compare Kelowna and Mississauga on kW per rack, cabinet size, cooling and carriers.
Check the site specification against your hardware: power, cooling, resilience and connectivity.
Half rack, full rack or private cage, all with A+B power.
Install your hardware with remote hands or 24/7 smart hands on call.
Pricing on request. Tell us your rack count and kW per rack and Hut 8 will scope it.
A half-cabinet footprint for smaller deployments.
A full cabinet, enough at 135 kW and up for a complete GPU node.
A dedicated cage for larger or more isolated deployments.
Support: remote hands (billed hourly) or 24/7 smart hands. On-site equipment storage is available.
As at Q3 2026, Hut 8 reports 5 MW of high-density capacity available now across its two flagship sites: 2.5 MW in Kelowna, BC (of 3 MW secured) and 2.5 MW in Mississauga, ON (of 3.5 MW designed). Capacity changes, so confirm current availability with Hut 8 before planning around it.
Both high-density sites support 135 kW and up per rack. Kelowna supports up to 135 kW per rack in 50U cabinets. Mississauga supports 135+ kW per rack in 42U cabinets. At that density, a full GPU node can sit in a single cabinet.
Yes. Both sites are liquid-cooling capable. Kelowna uses a chilled-water closed loop plus air with N+1 cooling, two 200-tonne chillers, cold aisle containment and a winter free-cooling advantage. Mississauga uses chilled water.
Hut 8 says high-density deployments typically go live in a few weeks. The usual path is to shortlist a site, review its spec sheet and deploy. Timing depends on your hardware and the capacity available when you ask.
Yes. Equipment at every Hut 8 Canada site is hosted in Canadian facilities, which supports PIPEDA data residency. Every site is SOC 2 Type II certified, uses card and biometric access, and is watched by 24/7 NOC-monitored CCTV.
Both sites are designed to keep running through a grid outage. Kelowna has 2N (A+B) power, N+1 cooling and two 1,500 kW generators with more than 29 hours of runtime at full load. Mississauga has 2N power, 2N UPS and ten 700 kW generators (N+1) with more than 24 hours of runtime. Both carry a 99.99% uptime SLA.
Choose Kelowna for liquid-cooled GPU clusters on 95% renewable hydroelectricity, larger 50U cabinets, or a second site alongside Vancouver. Choose Mississauga for dense deployments close to the Greater Toronto Area, with 42U cabinets and five carriers. Both connect to Hut 8's 100G national backbone.
Hut 8 offers half rack, full rack and private cage colocation, all with A+B power. Support is available as remote hands or 24/7 smart hands, and Remote Hands and Eyes is billed hourly. On-site equipment storage is available, and every site is monitored by a 24/7 network operations centre.
Tell us your rack count, kW per rack and timeline. Your request goes to Hut 8's team and to InfraHub.
Include your rack count, kW per rack and target date in the message.